Custom Search


Cost to Install Corian Countertops


Our corian counter costs for 2024 calculator allows you to change dimensions/edging & refigure.


Corian Counter Install Cost Options:

Counter Dimensions 1
 
Inches Deep X Inches Long
Backsplash 2 Inches High
Corian Edging Style 3






Standard
[ ex: Eased/Roundover & Single Bevel Edge ]
Upgrade
[ ex: Double Roundovers & Bevels ]
Higher End
[ ex: Bullnosing, Laminate Roundovers ]
 

 
Low
Mid
High
     
Corian Materials & Fabrication
$2,592.74
$3,496.69
$4,400.64
     
Labor to Install Corian Counters  
$352.55
$441.65
$530.75
   
Total Cost
$2,945.29
$3,938.34
$4,931.39
         
Average Sq. Ft. Cost  
$47.98
$64.15
$80.33

Includes all labor, materials and supplies needed for performing the work based on entered countertop dimensions. Results are approximations based on installs for corian in the United States. Total cost sums exclude any taxes charged for both materials and labor amounts.

Options for Installing Corian:

1 The standard depth of counters is 26 inches deep (adjustable). The total length in inches.
2 Assumes that the backsplash runs the entire counter length when present. For variously tall wall cabinets, take the average height.
3 Standard nosing styles that usually come included with corian base pricing. Other Upgrades may include large Ogee edges and 3/4 Roundovers. Here, the term Laminates is used to describe the adding of layers to achieve a thicker frontal edge.

Inclusions and Exclusions

Included is the pulling of the existing countertop surface and disposing of it. Also included are the corian cutouts for the sink and holes for plumbing.

Labor, Materials and Supplies notes:

  • The labor component charged to the project only.
  • Includes all labor needed for completion of project from measuring counters, and leveling, on to the final install including labor required for placing corian and any caulking of seams.
  • Includes all materials and supplies needed for prepping and clearing the subsurface. Corian materials allocates amounts due to waste factor.
  • Includes fabrication efforts needed to attain desired corian nosing.
  • Final cleanup and disposal of waste is allocated within these amounts.

  • Amounts for the labor portion per specific geographic locales may fluctuate based on the particular zip code by 5% and greater.




    Saturday, Dec 21, 2024












    © 2000, 2001 - 2024 Referwork. All rights reserved.